PlainFigure

Bathroom remodel cost calculator

Estimate vanity and countertop, shower or tub work, tile, fixtures, flooring, trades, labor markup, permits, temporary bathroom costs, contingency, financing payment, cash gap, cost per square foot, and possible resale value impact.

Runs in your browser No signup Bathroom scope and financing math Transparent methodology Affiliate links disclosed

Bathroom scope and line items

Optional, used for cost per square foot.
Include waterproofing, pan, surround, and tile labor.
Raise this for layout, vent, valve, or panel changes.

Cash, financing, and value

Keep emergency funds separate.
Optional resale/appraisal estimate.

This is a planning estimate, not a contractor bid, lender quote, permit approval, appraisal, waterproofing warranty, or inspection report.

Base remodel cost
Contingency
Total budget
Cash shortfall / surplus
Financed payment
Cost per sq ft
Value recovery
Equity impact
CategoryAmountShareWhat it means

Financing payment is principal and interest only. Actual financing may include fees, closing costs, variable rates, draw schedules, lien rules, underwriting limits, or prepayment terms.

Methodology notes

Base cost

Base remodel cost adds vanity/countertop, shower/tub/tile, toilet/fixtures, flooring, plumbing/electrical, labor, permits/design, and contractor markup on direct work.

Contingency and cash

Contingency is applied to the base remodel cost. Total budget adds contingency and temporary bathroom or lodging allowance, then compares that total with cash plus planned financing.

Financing and value

Monthly payment uses standard amortization. Value recovery compares expected home value increase with total budget, and equity impact subtracts planned financing from expected value increase.

Actual bathroom costs depend on contractor quotes, local labor, waterproofing method, plumbing access, tile complexity, permit requirements, inspection outcomes, lead times, mold or rot, layout changes, financing terms, and resale value uncertainty.

Bathroom remodel FAQ

What makes bathroom remodels go over budget?

Common overrun drivers include waterproofing failures, mold, rot, subfloor damage, plumbing relocation, outdated electrical, code upgrades, custom tile labor, glass delays, and change orders after demolition.

Should I finance a bathroom remodel?

Financing can make the project possible sooner, but payment, fees, rate risk, and lien terms matter. Compare the payment with your full housing budget and keep emergency cash outside the remodel budget.

How should I compare contractor quotes?

Compare the same scope: demolition, waterproofing, shower pan, tile, fixtures, vanity, trades, permits, design, cleanup, warranty, allowance amounts, and change-order rules.

Related calculators